Skip to Main Content
Spotfire Ideas Portal
ADD A NEW IDEA

All ideas

Visual Transparency

Add possibility to control transparency level of any visual. Like in the attached
about 2 years ago in Spotfire / Visualization 2 Needs Info

Add 3d pie chart options

add in 3d pie charts
almost 9 years ago in Spotfire / Visualization 1 Future Consideration

Show Calculated Columns Precedents and Dependents

When making several calculated columns that refer to other columns it would be useful to see a branch out of all the columns that go into a calculated column. Also, the ability to see the columns that are dependent on the calculated column would h...
almost 9 years ago in Spotfire / Data Management 0 Future Consideration

Get Page /Tab level usage of spotfire report

We have a spotfire report which contains 12-15 pages and we would like to track usability of different page in that analysis by users from log files. I know we had tab level monitoring available in spotfire version 5.5 but later version does not h...
almost 9 years ago in Spotfire / Library 3 Future Consideration

Enable ability to add DB hints to information link without using freehand SQL

Hints are sometimes useful to improve performance of an information link but can only be added as FREEHAND. Freehand then locks the SQL and changes to filter parameters aetc are not honored
almost 9 years ago in Spotfire / Information Services 0 Future Consideration

Keep old cache, while new cache is being generated.

Scheduled Updates allows reports to be cached. These can help reports that take a very long time, to open much quicker. Also the schedule can be set for various frequencies. But it seems the process deletes the old cache before starting a new cach...
about 2 years ago in Spotfire / Scheduled Updates 0 Future Consideration

more flexibility to arrange visualizations

Customer wants more flexibility to arrange visualizations. For example, they want to achive what PowerPI can do in Spotfire.
about 2 years ago in Spotfire / Visualization 1 Needs Info

SPC Charting Node

When the option to "Include Ppk in graph"is checked in a chart configuration workspace but the data for a parameter has no variance (e.g. Bioburden results all equal to 0), the admins get a warning email "Variability too small (all values are the ...
over 4 years ago in Spotfire Statistica 0 Future Consideration

Hortonworks connector system trust store support

It's a pain to distribute and maintain certificate (.pem) files on Windows clients for the ODBC driver for Hortonworks. The Spotfire connector for Hortonworks should have a checkbox that enables the system trust store instead of the driver's local...
over 6 years ago in Spotfire / Data Access 0 Future Consideration

Keep old output columns when adding new output columns in data function

Say we have a data function that has column A as output. When the script is altered and a new column B is added as output, then an additional column A is added along with the new column B. However, as calculated columns etc. might depend on the ol...
almost 9 years ago in Spotfire / Analytics / Data Functions 0 Future Consideration