Skip to Main Content
Spotfire Ideas Portal
ADD A NEW IDEA

Ideas

Showing 4195 of 4798

Determine column types using type information in data set rather than data values

Spotfire infers column types by examining the values in (the first 1000) rows of the data set being loaded. This generally works well but makes mistakes often enough that manual correction becomes laborious. A case in point is when real-valued dat...
almost 8 years ago in Spotfire / Data Management 1 Future Consideration

Color the empty cells in Cross table

Hi, We would like to be able to color the empty cells in the cross table. At the moment there is no way to color them by any role. Regards,
almost 9 years ago in Spotfire / Visualization 2 Future Consideration

Plot data from two tables in the same coordinate system without restructuring the data

Sometimes I have two or more pairs of measures that I want to plot on the same chart like this: To do this in Spotfire today, you have to restructure the data so that there is only 1 set of x values and use Color by to "Line ID". Although this is ...
over 5 years ago in Spotfire / Visualization 1 Future Consideration

Support any upgrade activity with zero downtime

We support a large global Spotfire Consumer user base, most of whom don't know that they're using Spotfire (they just know they use 'such and such dashboard'). As such, we need the ability to apply any changes to our environment without user impac...
almost 9 years ago in Spotfire / Installation 0 Future Consideration

Label by aggregated values in treemap

The treemap currently only supports categorical labels on the tiles. It would be good to be able to also add labels that shows aggregated values such as e.g. the expressions used to calculated the size or the color.
over 4 years ago in Spotfire / Visualization 1 Future Consideration

Event Based Scheduling (Trigger from a file or schedule)

Other BI tools that we use have the concept of event based scheduling. So in addition to a schedule firing at a given time/day and frequency the schedule only fires if a designated trigger file can be found or another schedule that this schedule i...
over 8 years ago in Spotfire / Scheduled Updates 4 Future Consideration

Drill Through into detail in ERP Systems

BI tools is often used for analysis of ERP data on aggregated level. Analysing e.g. production, sale or finance data, you might come to a point where not all details are available through the BI tool. For these cases, users would sometimes value a...
almost 4 years ago in Spotfire / Mods 0 Future Consideration

paginite "Users" web management console page

In v14.0, error message "Note: Maximum number of results reached. Use search to narrow down the results" will be shown if number of users is greater than 300, our customer is asking for the capability to paginate this page if number of users is mo...
5 months ago in Spotfire / System Administration 0 Future Consideration

How to realize different specification lines in the same visualization trellis by column and the specification can change by different column

Hi Developers, Please refer to the attached template where we have a scatter plot representing 4 columns for the y-axis and trellised by column names. Each one of 4 y-axis parameters has different specification limits. But we found all the spec li...
about 6 years ago in Spotfire / Visualization 1 Future Consideration

add option to draw confidence interval curve and prediction interval curve in scatter plot

Please add option to draw confidence interval curve and prediction interval curve in scatter plot. Currently we are using TERR inline expression to draw these curves but they must be calculated by adding new calculated columns and it's not flexibl...
over 2 years ago in Spotfire / Visualization 0 Future Consideration