Skip to Main Content
Spotfire Ideas Portal
ADD A NEW IDEA

All ideas

Showing 4800

Drill Through into detail in ERP Systems

BI tools is often used for analysis of ERP data on aggregated level. Analysing e.g. production, sale or finance data, you might come to a point where not all details are available through the BI tool. For these cases, users would sometimes value a...
about 4 years ago in Spotfire / Mods 0 Future Consideration

Have a tool to relate versions between different stages

In a multi stage (e.g. DEV, TEST, VAL. PROD)environment with SDMS in place. It would helpful to have a tool providing information about which version on one stage is related to a certain version on another stage. e.g workspace on val is version 1....
almost 6 years ago in Spotfire Statistica 0 To be Reviewed

How to realize different specification lines in the same visualization trellis by column and the specification can change by different column

Hi Developers, Please refer to the attached template where we have a scatter plot representing 4 columns for the y-axis and trellised by column names. Each one of 4 y-axis parameters has different specification limits. But we found all the spec li...
about 6 years ago in Spotfire / Visualization 1 Future Consideration

Show No Items if No Related Items Found Based on Current Marking w/Related Tables

I'd like an option for Spotfire to show no items in a details visual if "Limit data using markings" is set to "Rows must be included in: All Markings (AND)", and an item(s) is marked in a master visual(s) that does not relate to any of the items i...
almost 6 years ago in Spotfire / Filters 0 Future Consideration

add option to draw confidence interval curve and prediction interval curve in scatter plot

Please add option to draw confidence interval curve and prediction interval curve in scatter plot. Currently we are using TERR inline expression to draw these curves but they must be calculated by adding new calculated columns and it's not flexibl...
over 2 years ago in Spotfire / Visualization 0 Future Consideration

Add support for Presto as a data source to TDV

TDV needs an adapter for Prestodb.io. This idea is for simple data source access, not caching or data ship. If this is of interest to you, please indicate in the comments the use case and level of support you need, i.e., not only data source but c...
over 7 years ago in Spotfire Data Virtualization / data sources 2 Unlikely to implement

Modify the thickness of gridlines

No description provided
almost 10 years ago in Spotfire / Visualization 4 Future Consideration

Case-insensitive TDV search

Since 11.6 TDV can be browsed and searched directly from the files and data flyout, an excellent addition! Unfortunately contrary to (all) other search sources the TDV view search is case sensitve. Making it also case insensitve seems to be the be...
about 4 years ago in Spotfire / Data Access 0 Future Consideration

Ability to retrieve accidently deleted files from the Library, like "Recycle bin"

I think you should enhance the Spotfire product to have accidentally
almost 10 years ago in Spotfire / Library 2 Likely to implement

Increase text length limit for Data Entry Setup labels

Currently Data Entry Setup labels have a text length limit of 512, we have cases where users want to enter values greater than 5000 characters to track comments and other text-based entries.
over 6 years ago in Spotfire Statistica 1 Future Consideration